vaieri [72.5K]
3 years ago
15

Suppose two threads execute the following C code concurrently, accessing shared variables a, b, and c: Initialization int a = 4;

int b = 0; int c = 0; Thread 1 Thread 2 if (a < 0) { b = 10; c = b-a; a = -3; } else { c = b + a; } What is the total number of possible values for c after both threads complete? You can assume that reads and writes of the variables are atomic and that the order of statements within each thread is preserved in the code generated by the C compiler?
Computers and Technology
1 answer:
Oksanka [162]3 years ago
6 0

Answer:

Therefore, there are 4 possible values for c after both threads complete

c = 4, 14, 3, 13

Explanation:

Initialization:

int a = 4;

int b = 0;

int c = 0;

Thread 1:

if (a < 0)

{

c = b - a;

}

else

{ c = b + a; }

Thread 2:

b = 10;

a = -3;

We have to consider all the possible cases.

Case 1: a = 4, b = 0, c = 0

if (a < 0) false

{

c = b - a;

}

else

{ c = b + a; }  c = 0 + 4 = 4

c = 4

Case 2: a = 4, b = 10, c = 0

if (a < 0) false

{

c = b - a;

}

else

{ c = b + a; }  c = 10 + 4 = 14

c = 14

Case 3: a = -3, b = 0, c = 0

if (a < 0) true

{

c = b - a; c = 0 - (-3) = 3

}

else

{ c = b + a; }  

c = 3

Case 4: a = -3, b = 10, c = 0

if (a < 0) true

{

c = b - a; c = 10 - (-3) = 13

}

else

{ c = b + a; }  

c = 13

Therefore, there are 4 possible values for c after both threads complete

c = 4, 14, 3, 13

You might be interested in
Which of the following Office Online apps is most effective for creating spreadsheets?
navik [9.2K]
The answer is C Excel. Excel allows you to make spreadsheets.

Hope this helps :-)
4 0
3 years ago
Read 2 more answers
1.What is a project methodology?
blagie [28]

Explanation:

1. Let’s suppose that we want to test a scientific hypothesis. What we need to do first is to come up with steps and techniques for testing this hypothesis. This, in a similar way explains what project methodologies are. A project methodology gives us a properly organized way of planning and executing a substantial amount of work that needs to be completed in a given amount of time. Think of it as a game plan that you need to up with to develop a product or an IS.

2. Following a particular methodology comes with its own advantages.

  1. 1. It gets you focused on the product you are trying to come up with.
  2. 2. So many lessons will be learnt and will be documented as experiences and will be integrated as best practice. In the event that the project is a success, the same methodology can be used once again in the future.
  3. 3. Saves time since the same prescription of tools, phases, and techniques used for a particular project can be reused once more to come up with another project.

3. It maps out the existence of a project from start to finish. It is defined within a given methodology. Projects, like humans, have defined life-cycles. The same way we come out of wombs, grow, mature, decline, and then die is the same way a project has a beginning, mid, and end.

4. It does not matter whether a project one is working on is huge or not, they have to be organized into a sequence of phases for manageability. These phases include phase exits, stage gates, and kill points. Having these phases aligned together will give an organization a clear indication of how to evaluate the project’s performance and be able to mitigate problems that arise.

5. Starting the next phase just before the current one ends can sometimes be a good thing since it can reduce the schedule of the project. This is what is known as fast tracking. It is a good idea but introducing one phase before another one ends can cause an overlap and as a result can pose as a risk. Do it if the risks are within scope and can be accepted.

6. An idea that someone comes up with to build a new information system or product can be counted as one of the initiation processes of a PLC.  However, the first process is to define the goal of the project. Organizations have put amounts of time and investments into coming up with a project. Therefore, every little aspect of the project should be properly envisioned to meet the business's value. This is phase where we should ask ourselves questions like whether the project is going to be successful and how we will identify its success in correlation to the investments raised by the stakeholders. It is the phase upon which every detail is looked into carefully and goals defined before the project is flagged off.  

7. This phase provides the direction and planning for the project. Once the project has been flagged off and is ready to move forward, the team needs to define what the objectives will be, when and what time the project will be completed, and the amount of money that will be required to finish. In addition, things like how many people are we looking at to complete the project and the technology that will be used to build the project are highly considered and looked into in this phase.

8. At this point, the project must be approved first before moving on to this phase. The teams put all efforts of design, development, and delivery of the final product. Whoever has invested on the product will now start to have a clear picture of everything that is going on from the first phase of planning to the actual implementation based on time it has taken to the budget that has been so far.

9. Every beginning must always have an end and this is the phase that ensures a well-defined end. It ensures that the amount of effort and work that the teams have put in developing and implementing the product is complete. This phase also sees the team and stakeholders have meetings to try and consolidate and come into terms of whether or not the goals of the planning phase have been achieved.

10. Because every single project has its own goals and achievements that it wants to meet. Every product is unique in terms of what it wants to achieve and the principles and practices might not work for every project. It is the processes used to come up with the particular project that will play an integral part in the life cycle

Learn more about project methodologies by clicking on the link below

brainly.com/question/13821095

brainly.com/question/988326

#LearnWithBrainly

4 0
3 years ago
A customer has contacted you to help him alleviate the large amount of time and effort that goes into adding and removing users
Ostrovityanka [42]

Answer: On-demand

Explanation:

On-demand computing is the term of cloud computing that describes the function that provides organization with cloud hosting services. This function permits those organization to provide their customers for assessing computing resources and services as per necessity.

According to the question,on-demand is the computing function that should be used in the mentioned case. Technician and customers will get to access the computer as per their necessity and will not have to waste their efforts and time.

7 0
4 years ago
Which type of computer allows the user to enter text by handwriting
mixer [17]

Answer:Pen computing refers to any computer user-interface using a pen or stylus and tablet, over input devices such as a keyboard or a mouse.

4 0
4 years ago
After assembling a computer system the very first software to be installed is​
tatyana61 [14]

Answer:

operating system is the very first

after assembling a computer system the very first software to be installed is

8 0
4 years ago
Read 2 more answers
Other questions:
  • When age = 16, what action would the program execute?
    6·1 answer
  • Write a (java) program with a class called Sum1, using a while loop to add 10 numbers entered from the key-board.
    5·1 answer
  • how can you repin an image on your Pinterest pin board A. click on the "repin" button B. click on the "add pin" button C. click
    7·2 answers
  • Write a program that reads in investment amount, annual interest rate, and number of years, and displays the future investment v
    5·1 answer
  • What is batch processing?
    12·1 answer
  • Which option marks all modification made within a document? Review Comment Track Changes Balloons
    15·2 answers
  • What is the differnce between ''P4 and 4P''
    12·2 answers
  • Does anyone know how to fix this? Everytime i make a new page it only types in the middle of the page. I want to type at the top
    11·1 answer
  • Mha rp anyone? ima be baby shoto
    14·2 answers
  • Savings accounts _____.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!