Answer:
E. Core; flexible
Explanation:
Georgia Crane is allowed to create her own work hours on a limited basis. She must be a work from 9 a.m. to 11 a.m. and 1 p.m. to 3 p.m. every day which represents CORE time, and we can choose which hours she will work between 8 a.m. and 6 p.m. around the required hours, which represents FLEXIBLE time. The total required time is eight hours per day.
Georgia Crane is required to work 8 hours in a day.
The core time is the time which is important for Georgia Crane to be at work every day, that is, from 9am to 11am( 2hours) and 1pm to 3pm(2 hours).
That is a total of 4hours.
She can choose between 8am to 6pm as flexible time.
Recall that she needs a total of 4hours more to complete her time for the day.
So 9am to 11am is fixed, 1pm to 3pm is also fixed.
Her total flexible hours for the day 8am to 9am( 1hour), or 11am to 1pm(2hours), or 3pm to 6pm(3hours).
Total flexible hours is 1+2+3=6hours
She is required to choose 4hours from the total flexible 6hours that is most convenient for her to work.
2042 will be the year the fund drys up, based on its current level.
Answer:
b. Increase in communication and coordination costs
Explanation:
Based on the information provided within the question it can be said that she will likely experience a disadvantage with an Increase in communication and coordination costs. This is mainly due to the fact that those individuals are already used to communicating and coordinating with their teams in a very specific way that they have developed through months of working together. By putting members from different divisions together they have to learn how to coordinate with one another which will take time and money.
Answer:
$3,927
Explanation:
For the computation of bid price first we need to follow some steps which is shown below:-
Manufacturing overhead rate = Overhead cost ÷ Machine hours
= 45,000 ÷ 100,000
= $0.45
Total manufacturing cost charged to the school
= 2,000 + 400 + (900 × 0.45)
= $2,805
Markup cost = $2,805 × 0.4
= $1,122
Bid price of job = Total manufacturing cost charged to school + Markup cost
= $2,805 + $1,122
= $3,927
Answer:
Positioning strategies
Explanation:
In business , positioning strategies refers to the efforts that a company can do to influence some sort of perception toward their brands.
In the example above, Markup artfully arranged his products and priced to indicate product rarity in upscale neighborhood.
He did this because for customers with high economic power, presentation of a certain product will create the perception that owning that product indicates high social status. This probably held more value compared to the actual use function of the product itself.
On the other hand, he left his products in open boxes and placed haphazardly on shelves when targeting customers with lower income. He did this because among customers with lower income, presentation tend to matter less compared to the actual function of thier brand.