<span>5(2x - 7)
= 10x - 35
answer
</span><span>E. 10x - 35</span>
Answer:
Slope =-1/3
Step-by-step explanation:
(3,2)..... x1 =3, y1=2
(-3,4).... x2=-3, y2 =4
Slope=(y2-y1) /(x2-x1)
Slope=(4-2) /(-3-3)
Slope =2/(-6)
Slope=-1/3
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
C. 309,058,304
Three hundred nine million is in the millions bracket; wherein, three is in the hundred million place and nine is in the one million place.
fifty-eight thousand is in the thousands bracket; wherein 0 is placed in the hundred thousand place, five is in the ten thousands place, and eight is in the one thousands place.
three hundred four is placed as such because three should be in the hundreds place, 0 is in the tens place, and 4 is in the ones place.
Answer:
Step-by-step explanation:
4 workers × 5 hours = 20 worker-hours
Each vehicle requires 1 worker-hour
For five workers it will take four hours