Answer:
28
Step-by-step explanation:
Answer:
5 days
Step-by-step explanation:
This questions involves ratios, the job with 30 men can be done in 15 days, so the ratio from amount of men to amount of days the job will take to complete, it is 30:15. If we had 10 men instead of 30, 10 is one-third of 30, so you have to divide by 3 on each side of the ratio to get your answer.
If we do that we get the ratio 10:5.
Meaning that the 5 is the amount of days needed to be taken in order the complete the job.
Hope this helps!
I THINK IT'S ASA OR SSS ..
<span>For a parallelogram to be proven to be a rectange, the opposide sides must be parallel and the two adjacent sides must be perpendicular.
For two parallel sides, the slope of the two sides is equal.
Thus, for the parallelogram to be a rectangle, AB is parallel to CD.
The slope of AB = (y2 - y1)/(x2 - x1) while the slope of CD = (y4 - y3)/(x4 - x3)
Also, BC is perpedicular to CD.
For two perpendicular sides, the product of the slopes is -1.
The slope of BC is given by (y3 - y2)/(x3 - x2).
Therefore, for the parallelogram to be a rectangle.
(y2 - y1)/(x2 - x1) = (y4 - y3)/(x4 - x3) and (y4 - y3)/(x4 - x3) x (y3 - y2)/(x3 - x2) = -1.
The third option is the correct answer.</span>
k-1/2b=47 because the difference is subtraction and half b is a half fraction and it equals 47.