The intrinsic value of a call option can be calculated by subtracting the strike price from the market price ($108-$110=?). Therefore the intrinsic value of John's call option is $-2 or 0.
Answer:
The appropriate answer is "$8,457,50".
Explanation:
The given values are:
Direct material cost,
= $9,500
Direct labor cost,
= $10,400
Units completed in job 412,
= 4
Now,
The total cost for completion of job 412 will be:
= 
On substituting the values, we get
= 
=
($)
Unit produced cost will be:
= 
=
($)
70% of unit produced cost will be the profit margin, then
= 
=
($)
hence,
The price charged to the customer will be:
= 
On substituting the values, we get
= 
=
($)
Answer:
<em>The output is represented along OX and cost along OY; AFC curve represents average fixed cost. AVC curve represents average variable cost, ATC curve represents average total cost (i.e., total of AFC and AVC and is called AC, i.e., average cost). MC curve represents marginal cost</em>
Explanation:
<h2>•|ᴥ jess ᴥ|•</h2>
#keep learning
Answer:
people start black market for selling soup and delivering soup
Explanation:
we know here in winter due to snow highway is close so no transportation and if store will close than demand will be increase and supply will reduce
and if government reduce instant price up to 5 time for a short period than
i think people will try to stock it because there was a great demand and supply is very less than people start black market for selling soup and delivering soup
Answer:
Please see explanation.
Explanation:
Once the factory overhead rate is determined using the estimated amount of factory overhead and estimated base, it is used to charge overhead cost to the jobs, products or work performed.
Since, not all overhead costs are known at the time of making the product, (such as electricity bill is received after the month end) therefore, the estimated rate is used to apply the overhead cost to the job or product using actual activity level. This is called absorption or application of overheads to the products / jobs.
Due to this, at each period end, the management calculates and compares the actual overhead cost with the applied overhead cost and determine the over or under applied overheads.