Dont talk in abbreviations to elders, most of them might not know what that means and youll likely have to teach them
Answer: (C) Confirm project requirement
Explanation:
The configuration management is the type of system and it is collection of the formal document that is use to applying for the technical direction. It is the subsystem of the management system of the project.
It basically record each change occur in the project and then report the each change status in the project. It also control various physical characteristics in the project.
It identify all the physical and the functional characteristics of any type of service, result and product in the project document. It basically include the tracking system that is used for the document authorizing and also for the controlling purpose.
Full documentation in the man pages.
Answer:
1. Mass Storage Devices
2. Available Storage Space
3. Data Access Performance
4. Device Form Factor and Connection