<span>Krystal's rate = 1 floor in 16 min. = 1/16 floors per min.
Working together their rate = 1 floor in 5.76 min. = 1/5.76 floors per min.
We need to determine Perry's rate, so we need to equate their combined rate with the sum of the individual rates.
Let Perry's time = x
In equation form, we can write:
1/16 + 1/x = 1/5.76
Solve for x:
(x+16)/16x = 1/5.76 -> 5.76(x+16) = 16x -> 10.24x = 92.16 -> x = 9
So, Perry would take 9 mins. to do the floor alone.
I hope this helped!
Please Rate & Thank!
Please mark as Brainliest!
Have a wonderful night! : )</span>
Answer:
2x= 3x-7
-x=-7
x=7
so, the first option
Step-by-step explanation:
Answer:
slope = -
Step-by-step explanation:
Calculate the slope m using the slope formula
m =
with (x₁, y₁ ) = (23, - 30) and (x₂, y₂ ) = (- 7, 18)
m = = = = -
First add the 2 numbers in the ratio:
3+2 = 5
divide the 735 by 5:
735 / 5 = 147
now multiply 147 by 3 and then by 2 and that will be the ratios:
147 * 3 = 441
147 * 2 = 294
Answer:
B) 1, 8, √65
Step-by-step explanation:
For 3 side lengths to form a triangle the sum of two random sides must be bigger than the third side and their differences must be smaller than the third side.
1+8 > √65 because √65 is approximately 8.1
8-1 < √65