1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
rewona [7]
3 years ago
13

PLEASE HELP ASAP!!! CORRECT ANSWERS ONLY PLEASE!!!

Mathematics
1 answer:
RUDIKE [14]3 years ago
4 0

Jackie wants to keep her total work time <em>under </em>20 hours, so we can set up a rough inequality right away:

(work time in hours) < 20

Now, it's going to take here 1/2 = 0.5 hours to finish each necklace, an 1 hour to finish each bracelet, so if she's making x necklaces, it'll take her 0.5x hours to make all of them, and if she's making y bracelets, it'll take her 1y = y hours to finish those. Putting the two together, it'll take her 0.5x + y hours altogether to make the necklaces and bracelets. Putting that together with our first inequality, we get the final inequality

0.5x + y < 20

You might be interested in
Equation of the quadratic function represented by the graph is y=a(x-3)^2-1. What is the value of a?
Lunna [17]
I like pumpkins and you should too. The valiue of a is 2
3 0
3 years ago
Read 2 more answers
James bought a plant that was 3 inches tall. Each week the plant
sattari [20]

Answer:

1.5 inches/ week

Step-by-step explanation

Given

Height of he plant = 3in

If the plant grows by 2in every week

The rate of change = Height of plant/weekly increase

The rate of change = 3/2 = 1.5 inches/ week

6 0
3 years ago
A slitter assembly contains 48 blades. Five blades are selected at random and evaluated each day of sharpness. If any dull blade
Alex73 [517]

Answer:

Part a

The probability that assembly is replaced the first day is 0.7069.

Part b

The probability that assembly is replaced no replaced until the third day of evaluation is 0.0607.

Part c

The probability that the assembly is not replaced until the third day of evaluation is 0.2811.

Step-by-step explanation:

Hypergeometric Distribution: A random variable x that represents number of success of the n trails without replacement and M represents number of success of the N trails without replacement is termed as the hypergeometric distribution. Moreover, it consists of fixed number of trails and also the two possible outcomes for each trail.

It occurs when there is finite population and samples are taken without replacement.

The probability distribution of the hyper geometric is,

P(x,N,n,M)=\frac{(\limits^M_x)(\imits^{N-M}_{n-x})}{(\limits^N_n)}

Here x is the success in the sample of n trails, N represents the total population, n represents the random sample from the total population and M represents the success in the population.

Probability that at least one of the trail is succeed is,

P(x\geq1)=1-P(x

(a)

Compute the probability that the assembly is replaced the first day.

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly N = 48.

Number of blades selected at random from the assembly  n= 5

Number of blades in an assembly dull is M  = 10.

The probability mass function is,

P(X=x)=\frac{[\limits^M_x][\limits^{N-M}_{n-x}]}{[\limits^N_n]};x=0,1,2,...,n\\\\=\frac{[\limits^{10}_x][\limits^{48-10}_{5-x}]}{[\limits^{48}_5]}

The probability that assembly is replaced the first day means the probability that at least one blade is dull is,

P(x\geq 1)=1- P(x

(b)

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly  N = 48

Number of blades selected at random from the assembly  N = 5

Number of blades in an assembly dull is  M = 10

From the information,

The probability that assembly is replaced (P)  is 0.7069.

The probability that assembly is not replaced is (Q)  is,

q=1-p\\= 1-0.7069= 0.2931

The geometric probability mass function is,

P(X = x)= q^{x-1} p; x =1,2,....=(0.2931)^{x-1}(0.7069)

The probability that assembly is replaced no replaced until the third day of evaluation is,

P(X = 3)=(0.2931)^{3-1}(0.7069)\\=(0.2931)^2(0.7069)= 0.0607

(c)

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly   N = 48

Number of blades selected at random from the assembly  n = 5

Suppose that on the first day of the evaluation two of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M  = 2.

P(x=0)=\frac{(\limits^2_0)(\limits^{48-2}_{5-0})}{\limits^{48}_5}\\\\=\frac{(\limits^{46}_5)}{(\limits^{48}_5)}\\\\= 0.8005

Suppose that on the second day of the evaluation six of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M  = 6.

P(x=0)=\frac{(\limits^6_0)(\limits^{48-6}_{5-0})}{(\limits^{48}_5)}\\\\=\frac{(\limits^{42}_5}{(\limits^{48}_5)}\\\\= 0.4968

Suppose that on the third day of the evaluation ten of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M

= 10.

P(x\geq 1)=1- P(x

 

The probability that the assembly is not replaced until the third day of evaluation is,

P(The assembly is not replaced until the third day)=P(The assembly is not replaced first day) x P(The assembly is not replaced second day) x P(The assembly is replaced third day)

=(0.8005)(0.4968)(0.7069)= 0.2811

5 0
3 years ago
Nathaniel had a bag of 5 green marbles,3 blue marbles,6 red marbles,and 6 yellow marbles.Find the probability if Nathaniel pulls
Dovator [93]
To find probability, you'd have to find the total number of marbles (5+3+6+6=20), and since there are 3 blue marbles, the probability of picking one is 3 out of 20, or 3/20
If that blue marble isn't replaced, there will then be 19 marbles, and 2 blue ones. So the probability of him picking another blue marble is 2/19
8 0
3 years ago
Rachel runs 3.2 miles each weekday and 1.5 miles each day of the weekend how many miles will she have run in six weeks
elena-14-01-66 [18.8K]
3.2 x 5 + 1.5 x 2 = 19
4 0
3 years ago
Other questions:
  • Riona buys tomatoes for the pizza topping.
    13·1 answer
  • Brian has decided he would like to negotiate on a car with a $32,000 sticker price. If the dealer's cost on this car is 15 perce
    5·1 answer
  • What is the simplest form of /10,000x^64
    15·2 answers
  • What is the verbal expression for 1/8y
    7·1 answer
  • When x 4, y = 1<br> х^2 + Зry — 7у^2<br><br><br> Can you explain the whole answer.
    8·1 answer
  • Aaron Lloyd what is a?<br>​
    12·1 answer
  • How does the graph of the function g(x) = 5x + 1 differ from the graph of f(x) = 5*?
    7·1 answer
  • A classroom can accommodate less than 24 students.
    7·1 answer
  • Which integer in the set has the smallest value (-25, -5, -13, 3)?
    6·2 answers
  • Quick! I need an answer now! Please!
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!