1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
yanalaym [24]
2 years ago
9

Why do conflicts occur between Muslim nations in the middle east over religious issues?​

Social Studies
1 answer:
gogolik [260]2 years ago
3 0

Answer:

Racism between countries

You might be interested in
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
What type of management process function is being used when a manager motivates the workforce by rewarding them with additional
Arte-miy333 [17]

Answer:

Leading      

Explanation:

Leading is a management function which involves the manager motivating the workforce by using a reward system such as bonuses when targets are met or exceeded, additional vacation when standards are achieved. Leading involves the leaders ability to make his employee see the companies goals as their priority and to put in effort to achieve these goals. A good leader should be able to communicate the company's goals and carry his/her team along. Employee engagement in decision making is also a way to motivate the employees to put in their best.

6 0
2 years ago
Read 2 more answers
The First Punic War was fought over _____
kozerog [31]
The first Punic war<span> was fought to establish control over the strategic islands of </span><span>Corsica</span>
6 0
3 years ago
Read 2 more answers
Anne Frank's diary describing her life during WWII is it primary or secondary ​
Flauer [41]

Answer:

primary because its a firsthand dairy.

Explanation:

8 0
3 years ago
The Maya civilization was divided into __________ that traded with and sometimes fought wars against each other.
Akimi4 [234]
The Maya civilization was divided into different city states 
7 0
2 years ago
Read 2 more answers
Other questions:
  • Target area range is a survey of what lies about __________ seconds ahead of the vehicle
    13·1 answer
  • What amendment is executive privilege
    8·2 answers
  • The more you can do to convince the other party that his or her costs of delay or aborting negotiations will be costly, the more
    6·1 answer
  • A broker statement is an example of a(n) __________ record.
    15·2 answers
  • Why might this phrase: schedules of "reinforcement" be considered to be a bit of a misnomer?
    13·1 answer
  • The Federal Reserve wants to change the nominal interest rate from 4% to 6%. What action must the Federal Reserve take?
    5·2 answers
  • Which psychologist was one of the first to study traits?
    6·1 answer
  • Why is Memorial Day soo important
    10·2 answers
  • From the sample sizes listed below, choose the minimum sample size that will give a very accurate indication of the attitudes an
    6·1 answer
  • State True/False against the following sentences :
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!