Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Vertex point: (1, -4)
X-intercepts: (-1, 0) , (3, 0)
Y-intercept: (0, -3)
Axis of symmetry: x = 1
This function will create a parabola that opens upwards. I’m not entirely sure what I was supposed to answer. Hopefully this covered it. I’ll attach an image of the parabola in case I missed anything.
Answer:

Step-by-step explanation:
Using the slope formula:
