Answer:
V=201.06 ft²
Step-by-step explanation:
V=
r²h
V=
2²16
V=64
V=201.06
Answer:
the probability that I chose red or blue is 75%
75%
I believe that the answer is about 11 square feet because when you divide 16 by 1.5, you get 10.666666667, and most likely they won't be accepting an answer like that. So, you round to the nearest square feet and you get 11.
Answer:
10. (5, 6)
11. (1, 2)
12. (7, 8)
13. (10, 11)
14. (27, 28)
15. (11, 12)
Step-by-step explanation:
If you're not familiar with the squares of small integers, your calculator can help you figure this.
10. √28 ≈ 5.291 . . . . between 5 and 6
11. √3 ≈ 1.732 . . . . between 1 and 2
12. √59 ≈ 7.681 . . . . between 7 and 8
13. √115 ≈ 10.724 . . . between 10 and 11
14. √772 ≈ 27.785 . . . . between 27 and 28
15. √140 ≈ 11.832 . . . . between 11 and 12
Answer:
<em>The test statistic Z = 1.844 < 1.96 at 0.05 level of significance</em>
<em>Null hypothesis is accepted </em>
<em>Yes he is right</em>
<em>The manager claims that at least 95 % probability that the plant is operating properly</em>
Step-by-step explanation:
<u>Explanation</u>:-
Given data Population mean
μ = 885 tons /day
Given random sample size
n = 60
mean of the sample
x⁻ = 875 tons/day
The standard deviation of the Population
σ = 42 tons/day
<em><u>Null hypothesis</u></em><em>:- H₀: </em>The manager claims that at least 95 % probability that the plant is operating properly
<u><em>Alternative Hypothesis :H₁</em></u>: The manager do not claims that at least 95 % probability that the plant is operating properly
<em>Level of significance</em> = 0.05
The test statistic



|Z| = |-1.844| = 1.844
<em>The tabulated value</em>
<em> </em>
<em></em>
<em>The calculated value Z = 1.844 < 1.96 at 0.05 level of significance</em>
<em>Null hypothesis is accepted </em>
<u><em>Conclusion</em></u><em>:-</em>
<em>The manager claims that at least 95 % probability that the plant is operating properly</em>
<em></em>
<em></em>