7% in decimal form is 0.07
v₀ = initial velocity of the freight train while it approach a road crossing = 16 km/h = 16 (5/18) m/s = 4.44 m/s
v = final velocity of the freight train after it crosses a road crossing = 65 km/h = 65 x 5/18 m/s = 18.06 m/s
t = time to do so = 10 min = 10 x 60 sec = 600 sec
acceleration is given as
a = (v - v₀ )/t
a = (18.06 - 4.44)/(600)
a = 0.023 m/s²
a = 294
450000 * .08
= 36,000
They reduce $36,000 from the original price.
165.63-$18.99= $146.64
$146.64 / .78€ per mi= 188miles
188 miles is your answer
Answer:
Step-by-step explanation:
Rule: never completely trust a diagram that comes with a geometry question. This is a case in point. The "tiny" square is actually much larger than the "larger" square.
If you are trying to find the length of the sides of the squares, the formula is
Area = side^2
3025 = side^2
Take the square root of both sides.
sqrt(3025) = sqrt(side^2)
To find the square root of 3025, do the following
Press √
type in 3025
type in =
You should get 55.
======================
The second square is done the same way
√
90.75
=
And you should get 9.526