Answer:
12
Step-by-step explanation:
12 divided by 3 is 4 and 4 times 3 is 12
Answer:

a) $4110
Step-by-step explanation:
Let x represent number of rain coats and C(x) represent total cost to produce new line of rain coats.
We have been given that the fixed costs of $570 to set up for production, and variable costs of $30 per jacket.
The cost of x jackets would be
.
The total cost of x jackets would be variable cost of x jackets plus fixed costs that is $570.
Therefore, the total cost of producing x rain coats would be
.
To find the total cost of producing 118 rain coats, we will substitute
in the above equation as:



Therefore, the total cost of producing 118 rain coats is $4110 and option 'a' is the correct choice.
Answer:
3 hours and 45 minutes
Step-by-step explanation:
Answer:
x = 8, -8
When taking an absolute value the sign of a number is ignored. Therefore, both 8 and -8 would come out equalling 8.
Answer:
2 should be distributed as 2y + 8; y = 4
Step-by-step explanation:
Step 2 is wrong.
2(y + 4) = 4y
The step to solve is to expand brackets or distribute 2, not divide both sides by 2.
2y + 8 = 4y
Subtract both sides by 2y.
8 = 2y
Divide both sides by 2.
4 = y