Answer:
the second one is youre answer
Step-by-step explanation:
 
        
             
        
        
        
Using a system of equations, it is found that since 20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
<h3>What is a system of equations?</h3>
A system of equations is when two or more variables are related, and equations are built to find the values of each variable.
In this problem, the variables are:
- Variable c: number of child bikes.
- Variable a: number of adult bikes.
Each child bike requires 4 hours to build, as do each adult bike. The company has 100 hours of testing, hence:
4c + 4a = 100.
c + a = 25.
With 20 child bikes and 6 adult bikes in a week, we have that c = 20, a = 26, hence:
c + a = 26
20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
More can be learned about a system of equations at brainly.com/question/24342899
#SPJ1
 
        
             
        
        
        
Given:
Planes X and Y are perpendicular to each other
Points A, E, F, and G are points only in plane X
Points R and S are points in both planes X and Y
Lines EA and FG are parallel
The lines which could be perpendicular to RS are EA and FG. 
        
                    
             
        
        
        
The answer to your question is 3/8.