Time management,they wouldn’t have enough time to read it and they would become more stressed out
Answer: Scope creep
Explanation:
Scope creep in the project management basically refers to the uncontrolled development or growth in the project creep. It basically occur when the project scope are not appropriately defined.
It usually involve lack of change in the control system and increase the complexity of the project. It is also has poor requirement analysis.
So, that is why it is the biggest problem we usually face in the project management.
Answer:
The answer is Frequency Spectrum.
Explanation:
The frequency spectrum is range of all component frequencies.It contains all the waves which are as following:-
Gamma Rays
X-Rays
Ultraviolet
Visible light.
Infrared
Micro wave
Radio wave
These all waves have their range of frequencies.The waves that are visible to us is only the visible light.
<u>Virus outbreaks in an organization:</u>
In an organization end user who uses the computer or laptop or workstation is not aware of virus outbreaks. So As IT administrator of an organization she/he has aware of latest virus attack and rectification solution before outbreaks.
Common causes for this virus outbreaks problem is update virus definition or database. Update operating system patches on regular basis.
Installation appropriate anti-virus in each workstation or desktop or laptop and scheduling virus scanning and take necessary steps.
To address and troubleshoot disconnect workstation and desktop or laptop from LAN. Uninstalled unnecessary software, delete temp folder contents.