It would be 9.54x10^6 because the nine is 6 spaces away from the decimal point if you get what i mean.
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Answer:
C 18 x minus 9 = 72
D 3 (6 x minus 3) = 72
E x = 4.5
Step-by-step explanation:
Hope this helped
Simplify both sides of the equation
Subtract 2 from both sides
Divide both sides by 5


OR

Answer:
-10.27
Step-by-step explanation:
-7.54-1.98=-9.52, and -9.52-0.75=-10.27