Answer:
0.02 or 2% = Beta
Step-by-step explanation:
Given that,
Risk-free rate = 7 percent
Expected return on the market = 10 percent
Expected return on Security J = 13 percent
Therefore, the beta of Security J is calculated as follows;
Expected return on Security J = Risk-free rate + Beta (Expected return on the market - Risk-free rate)
13 percent = 7 percent + Beta (10 percent - 7 percent)
0.13 - 0.07 = 0.03 Beta
0.06 = 0.03 Beta
0.06 ÷ 0.03 = Beta
0.02 or 2% = Beta
Answer:
4
Step-by-step explanation:
she can use all 63 beads because 67 divided by 9 is 7 remainder 4
Answer:
A.6,0,1,4
Step-by-step explanation:
Answer: The ramp would be 15.5 feet long.
Step-by-step explanation: Please refer to the attached diagram for details.
Angle C shows the angle to be formed by the ramp from the ground, which is 15 degrees. Also, from the ground, it’s going to be four feet tall, which is line AB. The top of the ramp is point A, which makes line AC the entire length of the ramp. Since we have a reference angle (angle C) and two sides, the opposite and the hypotenuse, we shall apply the trigonometric ratio.
SinC = opposite/hypotenuse
Sin 15 = 4/b
By cross multiplication we now have
b = 4/Sin15
b = 4/0.2588
b = 15.4599
Approximately b = 15.5
Therefore the length of the ramp would be 15.5 feet
Answer:

Step-by-step explanation:



