Answer:
s(21) = 101.
Step-by-step explanation:
Just substitute n = 21 in the general form:
s(21) = 5(21) - 4
= 105 - 4
= 101. (answer)>
$17.50. I got stuck on this problem before too.
Answer:
c = $30 + $0.75p
Step-by-step explanation:
total cost = total fixed cost + total variable cost
total fixed cost = $30
Fixed costs are costs that do not vary with output.
total variable cost = variable cost per unit x total unit
p x 0.75
Variable costs are costs that vary with production
Answer:
it's a scalene triangle
Step-by-step explanation:
None of the sides are equal