s = hours it takes the small pipe on its own.
L = hours it takes the large pipe on its own.
we know the small pipe can do it in 11 hours total, so s = 11, so, how much of the whole job has the small done in 1 hour only?
well, if it takes 11 hours to do the whole thing, in 1 hour it has done only 1/11 of the whole job.
we know both pipes working together can do it in 6 hours flat. So in 1 hour only, both of them have done only 1/6 of the whole thing.
in that 1 hour, how much has the large one done? well, it has only done 1/L of the job.

and you can round that up as needed.
The answer will be 141 adults
Answer:
Top right.
Step-by-step explanation:
So we want a line with a slope of 3 and passes through (2,5).
To do so, we can use the point-slope form.
The point-slope form is:

m is the slope and x₁ and y₁ is an ordered pair.
Thus, let m be 3, y₁ be 5, and x₁ be 2. Thus:

Our answer is the top right :)
Answer:
-3/4
Step-by-step explanation:
(-8,4),(0,-2)

3m^3 -2m^2 + 4m + 2
To factor the first problem you have to divide all by 4
The second one is m - <span>√16m +8
To factor the second problem you have to square root it all</span>