Ok, lets visualize this scenario. We have a tank that is holding10450 ml of water. Then it tells use it is leaking at a rate of 270 ml per minute. Well, leaking would suggest something is being subtracted. Also, per minute means it is being subtracted each minutes so we use an x to represent the minutes. Ok, lets build the model
10450 - 270x = 0
The model above will tell us how many minutes it will take for the tank to be empty.
If we insert a number for x, the model below will tell us how many ml has leaked for the number of minutes we inserted into x.
10450 - 270x
Answer:
2
Step-by-step explanation:
Just think of f(2) as x, which is part of an ordered pair. Go to where x=2 on the graph, and search for y.
In this case, f(2)=2 because when x=2, y=2.
g(x) =- | x + 3 | + 4
adding 3 units to x shifts the graph 3 units to the left
the negative reflects the function in the x- axis
adding + 4 translates the graph vertically up by 4 units
To determine his gross pay, we need the amount of money he earns per hour and the rate of overtime per hour since he exceeded 40 hours of work. But since the rate for his overtime was not given. A general expression is what the most I can do. It is as follows:
Gross pay = 13.40(49) + overtime rate(9)
Hope this helps. Have a nice day.
22x
(11x) (2)
this is supposed to look like a factor tree where 11x and 2x are circled :)