<span> D) Train A by a factor of 1.1
</span>Train A: <span>17/35</span><span> = 34.6</span>
<span>Train B: </span>Rate<span> is the </span>slope<span> of the </span>equation, 31.35
Thus,<span>34.6/31.35</span><span> = 1.1036</span>
Answer:
so first put a dot on -5 on the y axis then go up 4 and to the right 1 and put a second dot and connect them
Check
A
B
F
the rest are less than 13
Answer: 1/4 ounces per hour
Step-by-step explanation:
In the 3 hours that the bucket has leaked, it has lost 3/4 ounces.
The rate at which it is leaking is therefore:
= 3/4 / 3
= 3/4 * 1/3
= 3/12
= 1/4 ounces per hour
Answer:
25 and 15
You can easily make a system of equations:
x + y = 40
x - y = 10
Solving for x on equation 2 gets x = 10 + y.
Plugging in this into the first equation, you get 10 + y + y = 40
Thus, 10 + 2y = 40
y = 15.
Plugging this back into either equation gets x = 25.