Answer:
Line S
Step-by-step explanation:
A geometric sequence is where you multiply by a constant number to get the next number.
An arithmetic sequence is where you add by a constant number to get the next number.
In the sequence 2, 10, 50, 250, the difference between the numbers are different, but when you multiply each number by 5, you get the next number.
This means that this is a geometric sequence.
The next term would be 250 x 5 which is 1250.
Mentally your dividing the 12.50 by 10 and then thats 1/10 of it.
The measure of QR is 6 units, which is 6 meters, since every unit on the coordinate grid is 1 meter.
The measure of UT is also 6 meters.
The measure of QU is 8 meters.
To find the measure of RS, we use the distance formula:

We substitute the coordinates of R and S into the formula and have:

To find the measure of ST we use the distance formula again, substituting the coordinates for S and T into the formula:

Now we find our perimeter by adding the sides together: 5.39 + 3.61 + 6 + 6 + 8 = 29 meters
Since fencing costs $24.75 per meter, we multiply this by our perimeter:
29(24.75) = $717.75
Answer:
x=8.5
Step-by-step explanation:
Write an equation
2x+5=22
x represents he unknown number
Solve for x:
2x+5-5=22-5
2x=17
2x/2=17/2
x=8.5