That would be the commutative property
Given the image attached, the segment bisector that divides XY into two and the length of XY are as follows:
- Segment bisector of XY = line n
- Length of XY = 6
<em><u>Recall:</u></em>
- A line that divides a segment into two equal parts is referred to as segment bisector.
In the diagram attached below, line n divides XY into XM and MY.
Thus, the segment bisector of XY is: line n.
<em><u>Find the value of x:</u></em>
XM = MY (congruent segments)

- Collect like terms and solve for x

XY = XM + MY


Therefore, given the image attached, the segment bisector that divides XY into two and the length of XY are as follows:
- Segment bisector of XY = line n
- Length of XY = 6
Learn more here:
brainly.com/question/19497953
She says 35 because number 7 in line says 31, so 31+4=35...
I hope this helped you!
Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.
Answer:
9:30 she finishes
Step-by-step explanation:
815 plus 75 is 890
there are 60 minutes in one hour
890-60 is 830
add 100 to represent another Hour
830 plus 100 is 930
9:30
therefore, it is 9:30