Answer:
Caucasus Mountain Range or Caucasus Mountains is between the black and caspian seas.
Explanation:
This mountain is a great barrier that extends for 750 miles and its tops exceed 4500 meters. It is located <u>between the Black Sea and the Caspian Sea.
</u>
It has two mountain ranges: the Great Caucasus, which is the largest mountain range and extends for 1200 km, and the Lesser Caucasus which is 600 km long.
This great mountain range was <u>created by the clash between the Arab plate and the Eurasian plate</u> approximately 28 million years ago. Due to the constant movement of plates,<u> it is a region prone to continuous strong earthquakes</u> although it does not have volcanic activity despite the existence of some stratovolcanoes.
Answer:
<em>MOST</em><em> </em><em>OF</em><em> </em><em>THEM</em><em> </em><em>ARE</em><em> </em><em>IN</em><em> </em><em>AGRICULTURE</em><em> </em><em>ACTIVITY</em><em>.</em><em> </em>
Explanation:
BECAUSE 1/3 OF THE POPULATION IS ENGAGED IN FARMING...
4 men x 8 days = 32 days work content & 6 women x 8 days = 48 work content
6 women at 1/400 per day x 8 days is 48/400. 352+ so 1 mans daily output is 11 work units per day x 4 men = 44 work output per day x 8 days = 352 total work output
3 men x 10 days = 30 days work content & 7 women x 10 days = 70 work content
1 man work output is 11 x 3 men x 10 days = 333 work units
one woman’s work output is 1/400 per day x 7 women = 7/400 per day x 10 days = Total of 70 work output plus men’s output of 330 = 400 work units.
10 women x 40 days = 400 work content
so if 10 men carried out the work its 11 x 10 men = 110 work units per day
400 work units + 110 work units per day = 3.6363 days work for 10 men.
1 women daily work output = 1/400 unit per person x 10 women or 10/400 work units per day so 10 x 40 days
4 Men & 6 Women = 8 days (men = 4 x 8 x 11 = 352)( 6 x 8 x 1/40 = 48/40
3 Men & 7 Women=10 days (men = 3 x 10 x 11 = 330)(7 x 10 x 1/40 =70/40)
10 women at 1/400 each per day x 40 days is 400 work units
while 10 men x 11 units is 110 units per day so for 400 units it’s 3.6363 days
1 man is equal approximately to 11 Women
10 men can do job in 3.6363 days x ratio of 11 =
Answer: It will taken 10 women x 40 days to complete the same job.