Answer:
7 groups
Step-by-step explanation:
1 hour = 60 minutes
3/4 of an hour = 3/4(60) = 45 minutes
therefore, 1 3/4 hours is 105 minutes
105 divided by 15 is 7
Answer:
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that the line pressure will exceed 1000 kPa during any measurement
This is 1 subtracted by the pvalue of Z when X = 1000. So



has a pvalue of 0.9525
1 - 0.9525 = 0.0475
4.75% probability that the line pressure will exceed 1000 kPa during any measurement
Well the total cost of the washing machine is 504. so that is it u can even use a calculator
Answer:
3/4
Step-by-step explanation:
i always hated ixl
Answer:

Step-by-step explanation:
3(2 + 4x) = -7 x 2 Distribute the 3
6 + 12x = -14 Subtract 6 from both sides of the equation
12x = -20 Divide both sides by 12
x =
Divide the top and the bottom of the fraction by 4
x = 