Answer:
The graph in option 3 will be the correct one.
Step-by-step explanation:
We have to choose the graph from the given options that shows the equation V = 4 + 2t, where V is the total volume of water in a bucket and t is the elapsed time in minutes.
Now, the graph in option 3 will be the correct one.
On a coordinate plane, the x-axis shows elapsed time in minutes (t) and the y-axis shows total volume of water (V). A straight line with a positive slope begins at point (0, 4) and ends at point (6, 16). (Answer)
Answer: 0.12
Step-by-step explanation: Well since 5/5=1 and in this case 3/5 of 0.2 or
3/5 x 0.2 = 0.12miles of the bridge is finished. to check do 0.2*2/5 since 2/5+3/5=5/5 or the total 0.2miles. so 0.2*2/5 =0.8 and 0.8+0.12= 0.2
Answer:
47
Step-by-step explanation:
10z + 4 + 8z + 2 = 168
first we find z
z = 9
5×9 +2 is 47
ANSWER IS 47
Answer:
350 miles per week
Step-by-step explanation:
That'd be 70 miles each day for 5 days, or 350 miles per week.
Answer: Your average monthly interest rate is0.18/12 = 0.015. So your average monthly interest is0.015×$850 = $12.75. Then the annual interest payments would be 12×$12.75 = $153