It would be $947.50 because you would multiply $189.50 by 0.05.
1/12 hour = 5 minutes, 2 weeks is 14 days, so 5*15 = the amount of time he brushes his teeth so you would need to change from hours to minutes
Answer:
A 9x--12 i hope this helps
Answer:
It will take 6 hours for the new pump to drain the pool.
Step-by-step explanation:
As the complete question is not given, the complete question is found online and is attached herewith
Let the rate of new pump is given as x=W/t_1
Let the rate of the old pump is given as y=W/t_2
it is given that the time t_2=2t_1
So by substituting the values of t_2 in the rate equation of y
y=W/2t_1
y=(W/t_1*2)=x/2
Also the total rate of both the pumps is given as W/t3 where t3 is given as 4 hours so the equation becomes
x+y=W/4
x+x/2=W/4
3x/2=W/4
As x=W/t_1
3W/2t_1=W/4
Now as W is same on both sides so
3/2t_1=1/4
12=2t_1
t_1=6 hours
So it will take 6 hours for the new pump to drain the pool.
Answer:
1.) 7x+5y
2.)-19m+14r
3.)22b+40c
4.)10x+25
5.)7m+7
Step-by-step explanation:
ez