You would take random numbers preferable smaller ones such as -1,0,1,2
You would put those in the place of x
Then you would square the value of x. After that you subtract 4. Whatever you come out with is your y value. Then you put the x value on the x axis and from that point count up or down to the number you need on the y axis. Together that would be your point
I have an expression

floating around in my head; let's see if it makes sense.
The variance of binary valued random variable b that comes up 1 with probability p (so has mean p) is

That's for an individual sample. For the observed average we divide by n, and for the standard deviation we take the square root:

Plugging in the numbers,

One standard deviation of the average is almost 2% so a 27% outcome was 3/1.9 = 1.6 standard deviations from the mean, corresponding to a two sided probability of a bit bigger than 10% of happening by chance.
So this is borderline suspect; most surveys will include a two sigma margin of error, say plus or minus 4 percent here, and the results were within those bounds.
Answer:
7 ; 6
Step-by-step explanation:
The length is 10
The width is 4
4 + 6 = 10
4 x 10 = 40