Operation overlord goes to france operation torch aouth africa opereration bagration eastern erourope
You could determine overall mission risk by: Using the highest<span> residual risk of all the identified hazards.
Residual risk refers to the action that still contain some sort of danger even though we already conducted any form of safety measurement for that action.
By knowing the highest residual risk, we could determine the STANDARD SAFETY MEASUREMENT TO TAKE to prepare for the worst possible scenario.</span>
Eurasian exchange system.
Answer: The government.
I hope I helped, If you need anything else just let me know and I'll try :)Good luck!