Given that the <span>roller coaster can accommodate 1600 riders per hour, thus the roller coaster can accomodate 1600 / 60 = 26.67 riders per minute.
Given that there are 345 people in the line, the number of minutes it will take for the 345 persons to get into the roller coaster is given by 345 / 26.67 = 12.94 minutes.
Therefore, it will take you 12.94 minutes to get to the front of the line.
</span>
Answer:
4.58 is greater then 4.563
Answer:
SP=Rs 800
Step-by-step explanation:
→As we have,
→Profit=SP-CP
Now,

We have to define an interval about the mean that contains 75% of the values. This means half of the values will lie above the mean and half of the values lie below the mean.
So, 37.5% of the values will lie above the mean and 37.5% of the values lie below the mean.
In a Z-table, mean is located at the center of the data. So the position of the mean is at 50% of the data. So the position of point 37.5% above the mean will be located at 50 + 37.5 = 87.5% of the overall data
Similarly position of the point 37.5% below the mean will be located at
50 - 37.5% = 12.5% of the overall data
From the z table, we can find the z value for both these points. 12.5% converted to z score is -1.15 and 87.5% converted to z score is 1.15.
Using these z scores, we can find the values which contain 75% of the values about the mean.
z score of -1.15 means 1.15 standard deviations below the mean. So this value comes out to be:
150 - 1.15(25) = 121.25
z score of 1.15 means 1.15 standard deviations above the mean. So this value comes out to be:
150 + 1.15(25) = 178.75
So, the interval from 121.25 to 178.75 contains the 75% of the data values.
Answer:
45.45 batteries
Step-by-step explanation:
The probability of any random battery being defective is 1 in 11, the number of expected defects in a population of 500 batteries is given by:

45.45 batteries are expected to be defective.