1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
padilas [110]
3 years ago
6

Which functions have graphs with slopes less than -2? (Check all that apply.)

Mathematics
1 answer:
Norma-Jean [14]3 years ago
8 0

Answer:

Function 2

Step-by-step explanation:

✔️Slope of function 1:

Slope (m) = ∆y/∆x

Using two points on the line, (0, 4) and (1, 9),

Slope (m) = (9 - 4) / (1 - 0)

Slope (m) = 5/1

Slope (m) = 5

✔️Slope of function 2:

Slope (m) = ∆y/∆x

Using the coordinates of any two given pairs form the table, (0, 1) and (1, -3):

Slope (m) = (-3 - 1) / (1 - 0)

Slope (m) = -4/1

Slope (m) = -4

✔️Slope of Function 3:

The function is given in the slope-intercept form, y = mx + b

m = slope

The function y = 2x - 5, therefore has a slope (m) of 2

Slope = 2

✔️Slope of Function 4:

Slope (m) = -1

✅Thus, the functions that has slopes less than -2 are:

Function 2: slope = -4

Function 1, 3, and 4 all have slopes that are greater than -2

You might be interested in
1.
8090 [49]
<span>1. 
<span>(02.03)  </span>

<span>Lea la siguiente afirmación: El segmento de línea AB es congruente con el segmento de línea QR.  </span>

<span><span>¿Cuál de las siguientes es una declaración equivalente?  </span><span>(4 puntos) </span></span>


<span> AB Overbar es similar a Overbar QR Overbar  </span>

<span>AB es igual a Overbar QR Overbar  </span>

<span>AB es un elemento de sobrerrango QR La Overbar  </span>

<span>AB es congruente con Overbar QR  </span>

<span>.  </span>
<span>(02.03)  </span>

<span><span>¿Qué enunciado es realmente el resultado de una transformación rígida?  </span><span>(4 puntos) </span></span>


<span> La imagen previa es congruente con la imagen.  </span>

<span>La imagen es más grande que la imagen previa.  </span>

<span>La imagen previa es más grande que la imagen.  </span>

<span><span>Cada uno es único; </span><span>no se puede hacer una declaración general sobre el tamaño.</span></span>
</span>
7 0
3 years ago
Two joggers start from different locations and simultaneously begin heading toward each other. One of the joggers jogs 19mph, wh
liq [111]

Answer:

It would take 9 hours for them to meet.

Step-by-step explanation:

 

Total distance covered by both per hour: 19+17=36

The total time to go 324 miles for them: 324/36=9

6 0
3 years ago
Read 2 more answers
12 1/2 of what amount is $10.40?
LuckyWell [14K]
Let x = what amount

Rewrite 12 1/2 as 25/2.

(25/2)(x) = 10.40

Take it from here. Solve the equation for x.
8 0
3 years ago
Read 2 more answers
I accidentally clicked that it isn’t the answer so help? What’s the correct answer?
katrin2010 [14]

The answer is A

-2 with a multi. of 2

4 with a multi. of 1

-1 with a multi. of 3

:)))

6 0
3 years ago
Read 2 more answers
Assembly Department $280,000
DIA [1.3K]
<h2><u>Answer :-</u></h2>

A. Commercial 540

Residential 360

B. Commercial 585

Residential 390

<h2><u>Explanation :-</u></h2>

a) Calculation to Determine the per-unit factory overhead allocated to the commercial and residential motors .

First step is to calculate the Plantwide overhead rate using this formula

Plantwide overhead rate =Estimated overhead /Estimated machine hours

Let plug in the formula

Plantwide overhead rate = 1080000/9000

Plantwide overhead rate = $ 120 per MH

Now let Determine the per-unit factory overhead allocated to the commercial and residential motors

Using this formula

Per -unit factory overhead allocated=Actual MH per unit *Plantwide overhead rate

Let plug in the formula

Per -unit factory overhead allocated to COMMERCIAL=4.5 dmh*120

Per -unit factory overhead allocated to COMMERCIAL=540

Per -unit factory overhead allocated to RESIDENTIAL=3.0 dmh*120

Per -unit factory overhead allocated to RESIDENTIAL=360

Therefore the per-unit factory overhead allocated to the commercial and residential motors under the single plantwide factory overhead rate method will be:

Commercial 540

Residential 360

b. Calculation to Determine the per-unit factory overhead allocated to the commercial and residential motors

First step is to calculate the Departmental overhead rate

ASSEMBLY TESTING

Estimated overhead 280,000 800,000

÷Estimated machine hours each department 4,000 5,000

=Departmental overhead rate 70 160

Now calculation the per-unit factory overhead allocated to the commercial and residential motors

COMMERCIAL RESIDENTIAL

Assembly 1.5 dmh*70=105 1.0 dmh*70=70

Testing 3.0*160= 480 2.0*160= 320

Per -unit factory overhead allocated 585 390

(105+480=585)

(70+320=390)

Therefore the per-unit factory overhead allocated to the commercial and residential motors under the multiple production department factory overhead rate method will be:

Commercial 585

Residential 390

7 0
3 years ago
Other questions:
  • Southern Florida has a mild climate. Which statement about the probility of snow in June in southern Florida is most likely true
    6·1 answer
  • I'm having trouble,
    7·2 answers
  • Callie buys 4 pounds of peanuts to every 9 pounds of almonds. If she
    5·1 answer
  • Evaluate the following expression: (7+5b)+1 , if b = 3
    13·1 answer
  • Company 2 charges $4600 for the first 550 feet of fence and $29 for each additional foot. Find the cost if Company 2 completes t
    6·1 answer
  • What's 12438 rounded to the nearest tenths?
    8·1 answer
  • Twice a number plus 5 is less than or equal to 15
    14·2 answers
  • X/-7 = -3 (equation)​
    11·1 answer
  • What is the area, in square units, of a trapezoid bounded by the lines $y = x$, $y = 10$, $y = 5$ and the $y$-axis? express your
    15·1 answer
  • The dot plots below show the weights of the players of two teams:
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!