Answer:
f(g(x)) = 722, and g(f(x)) = 154
Step-by-step explanation:
f(x) = 2x²
g(x) = 3x + 4
g(f(x)) = 3(2x²) + 4
g(f(5)) = 3(2 × 5²) + 4
g(f(5)) = 3(2 × 25) + 4
g(f(5)) = 3 × 50 + 4
g(f(5)) = 154
f(g(x)) = 2(3x + 4)²
f(g(5)) = 2(3 × 5 + 4)²
f(g(5)) = 2 × 19²
f(g(5)) = 2 × 361
f(g(5)) = 722
The sum of all angles in a triangle sum up to 180.
∠1 = x+37
∠2=x+67
∠3=90° (right triangle)
∠1+∠2+∠3 = 180°
(x+37)+(x+67)+90=180
2x+104+90=180
2x+194=180
2x=-14
x=-7
An angle can't be negative, but when plugged in it works!!
∠1 = -7+37=30
∠2=-7+67=60
30+60+90=180
Hope it helps!
Answer:
x=2
Step-by-step explanation:
9x+9=25+x
9x-x=25-9
8x=16
x=2
Answer:
-5
Step-by-step explanation:
a= -4 than 2 times-4. than be 8.and 4 square is -16. So it be 3+8-16 = -5
Answer:
29.49% probability that a production time is between 9.7 and 12 minutes
Step-by-step explanation:
An uniform probability is a case of probability in which each outcome is equally as likely.
For this situation, we have a lower limit of the distribution that we call a and an upper limit that we call b.
The probability that we find a value X between c and d, in which d is greater than c, is given by the following formula.

Production times are evenly distributed between 8 and 15.8 minutes and production times are never outside of this interval.
This means that 
What is the probability that a production time is between 9.7 and 12 minutes?
.
So


29.49% probability that a production time is between 9.7 and 12 minutes