1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
N76 [4]
3 years ago
6

Which function is represented by the graph?

Mathematics
2 answers:
Rainbow [258]3 years ago
5 0

Answer:

ummmmmmmm

Step-by-step explanation:

I would help but I have no picture of what you are needing

riadik2000 [5.3K]3 years ago
3 0
Photo? i cannot answer without a photo:)
You might be interested in
The temperature outside is currently 10°F. It will fall at a constant rate of 3°F per hour. Which temperature will it be in 4 ho
Triss [41]

Answer:

T4 = -2°F

Step-by-step explanation:

Given the following data;

Current temperature = 10°F

Constant, K = 3°F

Time, t = 4 hours

In four (4) hours, we have;

T = kt

Substituting into the equation, we have;

T = 3 * 4

T = 12°F

T4 = current temp - new temp

T4 = 10°F - 12°F

T4 = -2°F

Therefore, the temperature it will be in 4 hours is - 2°F.

6 0
3 years ago
Figure 1 is transformed to Figure 3, as shown in the diagram. Describe the transformation. A) dilation, then reflection B) refle
tresset_1 [31]
C. hope this helps...
3 0
4 years ago
Read 2 more answers
3. Jim bought 2 books yesterday. The price
natima [27]

Answer:

26.40 divided by 2 is 13.20 13.20 is your answer!

7 0
3 years ago
Suppose task B follows task A. The likelihood that a problem will occur with task A is 0.5, and the time to correct the problem
jasenka [17]

Answer:

The risk consequence of both activities is 1.6 months.

Step-by-step explanation:

We can define a randome variable D: total delay time for the project, and calculate its expected value.

This would be the risk consequence of both activities.

The expected delay time for the project is the sum of the expected delay for task A plus the expected delay for task B. It is assumed the likelihood of a problem in any task is independent of the other.

Then, each expected delay for a task is equal to the probability of a problem multiplied by the consequence (delay time).

E(D)=E(D_a)+E(D_b)=p_aT_a+p_bT_b\\\\E(D)=0.5*2+0.2*3=1+0.6=1.6

The risk consequence of both activities is 1.6 months.

6 0
3 years ago
PLEASE SOLVE THE QUESTION BELOW
Elenna [48]

9514 1404 393

Answer:

  (3.5, 4.5)

Step-by-step explanation:

That point will be the midpoint of either diagonal.

  (A +C)/2 = ((-1, 3) +(8, 6))/2 = (-1+8, 3+6)/2 = (7, 9)/2 = (3.5, 4.5)

The center of the rhombus is (3.5, 4.5).

4 0
3 years ago
Other questions:
  • Sorry the other people that gave me the answer were to sloppy with it so can someone help please
    5·2 answers
  • Solve the equation a = m – n for the variable n
    15·2 answers
  • you are going to buy pencils and notepads for 3 classes. If there are 12 students in each class, about how many cents in total a
    15·1 answer
  • A 8ft tall telephone booth standing next to an adult giraffe casts a 4ft shadow. If the adult giraffe is 14ft tall then how long
    15·1 answer
  • The sum of a two digit number and the number obtained by interchanging the digits is 132. If the two digits differ by 2, find th
    12·1 answer
  • Kerry has a bag containing white and yellow marbles. Kerry randomly selects one marble from the bag, records the result, and ret
    7·1 answer
  • Sarah downloaded two apps which were 7.48 kb total. If one app was 4.78 kb, how big was the other app?
    15·1 answer
  • Two airplanes leave the airport. Plane A departs at a 44° angle from the runway, and plane B departs at a 40° angle from the run
    15·1 answer
  • 4x^2-11x=78 quadratic formula
    8·1 answer
  • What exponential expression is equal to 2^-5 . 2^8
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!