I'm thinking A. Because uniformitarianism means the theory that changes in the earth's crust during geological history have resulted from the action of continuous and uniform processes.
<u>From the given options which may suitably apply to the description of grid-lines of the map are
</u>
- They are measured in degrees
- They set up a reference system
- They divide Earth into four equal parts
Answers: Options A, B and E
<u>Explanation:
</u>
Option A describes that the grid-lines of the map are measure in degrees, which are very true as the grid are lined with angular measurement which thus be done in unit of angles and is in degrees only.
Option B says it develops the reference system which specifies about the area being plotted are grid depending upon the size which sets up the referential system of enumeration.
Option E is true as the world or the Earth has been divided into 4 equal parts through the Prime Meridian as the longitudinal line and Equator as the latitudinal line.
4 men x 8 days = 32 days work content & 6 women x 8 days = 48 work content
6 women at 1/400 per day x 8 days is 48/400. 352+ so 1 mans daily output is 11 work units per day x 4 men = 44 work output per day x 8 days = 352 total work output
3 men x 10 days = 30 days work content & 7 women x 10 days = 70 work content
1 man work output is 11 x 3 men x 10 days = 333 work units
one woman’s work output is 1/400 per day x 7 women = 7/400 per day x 10 days = Total of 70 work output plus men’s output of 330 = 400 work units.
10 women x 40 days = 400 work content
so if 10 men carried out the work its 11 x 10 men = 110 work units per day
400 work units + 110 work units per day = 3.6363 days work for 10 men.
1 women daily work output = 1/400 unit per person x 10 women or 10/400 work units per day so 10 x 40 days
4 Men & 6 Women = 8 days (men = 4 x 8 x 11 = 352)( 6 x 8 x 1/40 = 48/40
3 Men & 7 Women=10 days (men = 3 x 10 x 11 = 330)(7 x 10 x 1/40 =70/40)
10 women at 1/400 each per day x 40 days is 400 work units
while 10 men x 11 units is 110 units per day so for 400 units it’s 3.6363 days
1 man is equal approximately to 11 Women
10 men can do job in 3.6363 days x ratio of 11 =
Answer: It will taken 10 women x 40 days to complete the same job.