Answer:
Step-by-step explanation:
<em>Original question is attached</em>
<h3>Option 1</h3>
- C(x) = 25x + 50
- C(8) = 25*8 + 50 = $250
<h3>Option 2</h3>
- As per table, the rate of change is $30 per 2 hours.
- So 8 hours will cost
- $190 + $30 = $220
As we see the second option is cheaper so we should hire the Master Remodeling
Answer:
4/5:2/5 = ratio of degrees to time
2/5*2.5 = 1 min
4/5*2.5 = 10/5 = 2
2 degrees every min
Step-by-step explanation:
She will need 12 seconds because -20•12=-240
Answer:
On a number line, -4 is located to the right of -5
Step-by-step explanation:
Juan rode the slowest. It took him 5 minutes to go 2 blocks and another 3 minutes to go 2 more blocks. It was taking him longer minutes to go 2 blocks at a time. Took Juan 17 minutes to do 8 blocks and Rita did 8 blocks in 8 minutes she was faster. Hope this helps