Answer:
1. A simple cashier working at a supermarket
2. Doctors/medical professionals
Step-by-step explanation:
Although usually simple the cashiers must be able to do basic math to be able to give the correct amount of change to the customer
Medical professionals are constantly converting measurements in the workplace needing math to help with their cases
Answer= 2w2-9w-5
Hope this helps
Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
The sample std. dev. will be (14 inches) / sqrt(49), or (14 inches) / 7, or 2 inches.
Find the z score for 93.8 inches:
93.8 inches - 91.0 inches 2.8 inches
z = ------------------------------------- = ----------------- = 1.4
2 inches 2 inches
Now find the area under the standard normal curve to the left of z = +1.4.
My calculator returns the following:
normalcdf(-100,1.4) = 0.919. This is the probability that the mean annual precipitation during those 49 years will be less than 93.8 inches.