Answer:
Hey
Step-by-step explanation:
500 feet total is your answer because if you multiply the two numbers you et 500
Answer:
A (52,2%, 55,8%)
Step-by-step explanation:
To get the confidence interval, we have to add the margin of error to the point estimator.
The middle of the interval is 54%, and the ME is 1.8%. Don't forget that this means ±1.8%!
54 - 1.8 = 52.2%
54 + 1.8 = 55.8%
So our confidence interval is (52,2%, 55,8%) and the answer is A.
Answer:
(−0.103371 ; 0.063371) ;
No ;
( -0.0463642, 0.0063642)
Step-by-step explanation:
Shift 1:
Sample size, n1 = 30
Mean, m1 = 10.53 mm ; Standard deviation, s1 = 0.14mm
Shift 2:
Sample size, n2 = 25
Mean, m2 = 10.55 ; Standard deviation, s2 = 0.17
Mean difference ; μ1 - μ2
Zcritical at 95% confidence interval = 1.96
Using the relation :
(m1 - m2) ± Zcritical * (s1²/n1 + s2²/n2)
(10.53-10.55) ± 1.96*sqrt(0.14^2/30 + 0.17^2/25)
Lower boundary :
-0.02 - 0.0833710 = −0.103371
Upper boundary :
-0.02 + 0.0833710 = 0.063371
(−0.103371 ; 0.063371)
B.)
We cannot conclude that gasket from shift 2 are on average wider Than gasket from shift 1, since the interval contains 0.
C.)
For sample size :
n1 = 300 ; n2 = 250
(10.53-10.55) ± 1.96*sqrt(0.14^2/300 + 0.17^2/250)
Lower boundary :
-0.02 - 0.0263642 = −0.0463642
Upper boundary :
-0.02 + 0.0263642 = 0.0063642
( -0.0463642, 0.0063642)
Answer:
the answer are x=4y-20
and x represents the independent variable and y represents the dependent variable