Answer:
Maximizing Profit. Waterbrook Farm includes 240 acres of cropland. The farm owner wishes to plant this acreage in both corn and soybeans. The profit per acre in corn production is $325 and in soybeans is $180.A total of 320 hr of labor is available. Each acre of corn requires 2 hr of labor, whereas each acre of soybean requires 1 hr of labor. How should the land be divided between corn and soybeans in order to yield the maximum profit? What is the maximum profit?
Step-by-step explanation:
Answer:
the term is separated by minus (-) and plus (+) .
therefore this term is trinomial.
There's a website called desmos.com. That website can tell you the answer
Well on a table of data, if the y coordinates increase a lot over a short x distance then it will be steep.
In an equation, you would put it into y = mx + b form and whatever your m is will be your slope. If m is large, it will be steep.