Its B because B is the one that gives you most of the detail
Answer:
I think C
Step-by-step explanation:
4 people x 45 minutes = 180 minutes total to paint 5 walls
180/5 = 36 minutes of man work per wall
36 * 4 walls = 144 total minutes
144/6 people = 24 minutes total
If it is 0.03,0.12,0.12 just add 0.09.
The next two numbers are 0.30,0.39
Answer:
g(1) = -6
Step-by-step explanation:
g(x) = -2x^2 - 4x
You want to solve for g(1). To do this make every x value in the original equation become 1.
g(1) = -2(1)^2 - 4(1)
Evaluate the exponent.
g(1) = -2(1) - 4(1)
Multiply.
g(1) = -2 - 4
Subtract.
g(1) = -6