Answer:
Nina has $10.47 left.
Step-by-step explanation:
$20.14 minus $9.67 is $10.47
For this case what we should do is evaluate the function in each of the points from 2 to 7 and then find the average.
We have then:
f (x) = ln (3x) +2.5.
f (2) = ln (3 * 2) + 2.5 = 4.291759469
f (3) = ln (3 * 3) + 2.5 = 4.697224577
f (4) = ln (3 * 4) + 2.5 = 4.98490665
f (5) = ln (3 * 5) + 2.5 = 5.208050201
f (6) = ln (3 * 6) + 2.5 = 5.390371758
f (7) = ln (3 * 7) + 2.5 = 5.544522438
Then the average is:
Average = (4.291759469 + 4.697224577 + 4.98490665 + 5.208050201 + 5.390371758 + 5.544522438) / (6) = 5.019472516
nearest hundredth
5.02
Answer:
the average rate of change of f (x) from 2 to 7 is 5.02
Answer:
C. Add 15 to both sides
Step-by-step explanation:
Given equation:
99x – 15 = 45
To solve:
<u>Step 1</u>: Add 15 to both sides:
⇒ 99x – 15 + 15 = 45 + 15
⇒ 99x = 60
<u>Step 2</u>: Divide both sides by 99:
⇒ 99x ÷ 99 = 60 ÷ 99
⇒ x = 60/99
⇒ x = 20/33
Answer:
20/7 days (just less than 3 days)
Step-by-step explanation:
Recall that (1 job) = (rate)(time), so time = (1 job) / (rate).
Set up and solve the following equation:
1 job
------------------------------- = time required for 2 pumps working together
1 job 1 job
---------- + -------------
4 days 10 days
This comes out to:
1 job
------------------------------------------- = time required
10 job-days 4 job-days
------------------ + -----------------
40 days 40 days
or:
1 job
-------------------- = (40/14) days, or 20/7 days (just less than 3 days)
14 job·days
-----------------
40 days