Job order costing also gives managers the advantage of being able to keep track of individuals' and teams' performance in terms of cost control, efficiency, and productivity. A disadvantage of job order costing is that employees are required to track all materials and labor used during the job.
With the standardization of products, managers track performance, productivity, and costs over time. Process costing allows for greater flexibility when making changes in the production process. Managers can target specific departments' processes or materials to lower production costs.
With process costing, companies track the flow of costs from department to department, rather than tracking costs for each individual item. Each department adds direct labor and manufacturing overhead costs, plus the cost of any raw materials it uses.
Learn more about the costing system at
brainly.com/question/24516871
#SPJ4
I don’t know if you want us to do it for you or just explain it, but integers are all whole numbers so just like make a piece of art with the word integer surrounded by whole numbers or something right? Or like a poem about how most things in the world are in wholes idrk
Answer:
You can use Unit rate to find the answer. (Divide)
Step-by-step explanation:
Answer:
arc QS = 95°
Step-by-step explanation:
the inscribed angle QSR is half the measure of its intercepted arc RQ , then
arc RQ = 2 × 95° = 190°
the sum of the arcs in a circle = 360° , then
arc QS = 360° - arc SR - arc RQ = 360° - 75° - 190° = 95°