Answer:
i'd say at least 2 waffle irons on the floor
Step-by-step explanation:
Answer:
Below.
Step-by-step explanation:
tan < XYZ = opposite/adjacent
= 8/20 = 0.4.
XYZ = 21.8 degrees to 3 s f.
first, distribute -6 to (2b + 1), giving you -12b - 6, and then on the another side of the equation, distribute -2 to (5 + 4b) giving you, -10 - 8b. now we need to put our coefficients on one side so we will add 8b to each side of the equation, giving us -6 = -10 - 8b + 12b, then we will add 10 to both sides of the equation giving us, 10 -6 = -8b +12b, this gives u 4 = 4b. then, you would solve for b, which equals 1.
Answer:
5.25 hours
Step-by-step explanation:
The calculation of the time needed to schedule for all seven applications is shown below:
Since 3 by 4 is required of an hour to meet you show them
i.e.
= 3 ÷ 4 of an hour
= 3 ÷ 4 × 60 minutes
= 45 minutes
Now for seven applications, the time would be
= 7 × 45 minutes
= 315 minutes
And, one hour = 60 min.
So, the time required is
= 315 minutes ÷60 minutes
= 5.25 hours