1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vera_Pavlovna [14]
3 years ago
11

The equation g(120) = 4 can be interpreted to mean: "On Day 2, 120 seconds after the

Mathematics
1 answer:
Scilla [17]3 years ago
4 0

Answer:

hole bola gola dhola sola

ur answer is c. g(t) = d

You might be interested in
Will award brainiest to whoever answers and helps, I really need this ;;
Naddik [55]

Multiply the probability by the cost of the accident:


14,886.05 x 0.071 = 1056.91

Now add the overhead cost:

1056.91 + 110 = 1166.91

The closest answer to this is number D.

4 0
3 years ago
Read 2 more answers
Find the unit vector in the direction of v=(7,-3).<br> (enter exact answers with square roots)
navik [9.2K]

Answer:

\binom{ \frac{7 \sqrt{58} }{58} }{  \frac{ - 3 \sqrt{58} }{58} }

Step-by-step explanation:

First, find the magnitude of the vector:

|v|  =  \sqrt{( {(7)}^{2} + {( - 3)}^{2})  } \\  =  \sqrt{(49 + 9)}  \\   =  \sqrt{58}

Then, divide each component of the vector by the magnitude to get the unit vector and rationalise:

unit \: vector =  \binom{ \frac{7}{ \sqrt{58} } }{ \frac{ - 3}{ \sqrt{58} } }  \\  =  \binom{ \frac{7 \sqrt{58} }{58} }{  \frac{ - 3 \sqrt{58} }{58} }

8 0
3 years ago
A negative number minus a positive number is always negative true or false?
MariettaO [177]

Answer:

False

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
In most acceptance sampling plans, when a lot is rejected, the entire lot is inspected and all defective items are replaced. Whe
photoshop1234 [79]

Answer:

When using this technique, the AOQ:

improves (AOQ becomes a smaller fraction).

Step-by-step explanation:

AOQ simply means Average Outgoing Quality, which improves with inspection.  It is a part of an organization's Acceptance Sampling Plan, usually designed to meet product quality and risk level targets.  The plan draws samples from a population of items.  Then it tests the samples.  It only accepts the entire population if the sample is considered good enough.  It also rejects the population when the sample is poor enough.  In the plan, information about sample size and critical acceptance or rejection numbers are clearly indicated.  Acceptance sampling is common in most business environments because it has been found to be more economical than doing 100% inspection of incoming production input and output.

4 0
3 years ago
Surface area of a triangular prism
NISA [10]

Answer:

C

Step-by-step explanation:

7 0
3 years ago
Other questions:
  • Jackson runs 7/8 mile in 1/2 hour. How many miles does Jackson run in 1 hour? Show work. Please answer this I don’t get it!!
    9·1 answer
  • PLEASE HELP!! <br><br> -1/3x + 1/6y = 2<br><br> 3/4x + 1/2y = -8<br><br> x = ? <br> y= ?
    12·1 answer
  • 36 is 0.9% of what number
    12·2 answers
  • Assume that XY=MN . Which of the following statements are true? (Assume that X, Y, M, N, and F are nonzero real numbers, and ass
    12·1 answer
  • the ratio of males to females at a camp is 5 to 4. If there are 40 males at the camp, how many females are there?
    5·2 answers
  • The function of f is defined by f(x)=x²-2x-24, find the range of f​
    5·1 answer
  • Select whether each equation has no solution, one solution, or infinitely many solutions.
    8·2 answers
  • (16 - 6) + f - 9 = 12
    13·2 answers
  • Find the 30th term of 156,153,150,
    12·1 answer
  • If a bank offers to double your money in 8 years, what is the effective rate of interest? ​
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!