To find the equation of this line in slope-intercept form (y = mx + b, where m is its slope and b is its y-intercept), we naturally need the slope and the y-intercept. We can see that the line intersects the y-axis at the point (0, 4) so our y-intercept is 4, and the line rises 4 along the y-axis for every 2 it runs along the x-axis, so its slope is 4/2 = 2. With this in mind, we can write the line's equation as
y = 2x + 4
Since the train travels at a rate of 70 miles/hour, the train will take 5 hours to have traveled a total of 350 miles. The missing information in the question you've proposed is the value of "H" or the number of hours (as the unit hours is indicated in the question). This can be determined with the formula <em>Distance = rate X time. </em>350 = 70 X H, in this case. To isolate the variable H, 70 (the rate) divides 350 (the total distance) into 5. 350 ÷ 70 = H. 5 = H, the amount of time spent traveling for 350 miles at a rate of 70 miles/hour.
The mystery number will be 19.4596
Answer:
its good :)
Step-by-step explanation:
Answer:24,942,060
Step-by-step explanation:
(10,10,4) - (3,2,0) = 7,8,4
7+8+4=19
19!/(7!*8!*4!)= 24'942'060