Answer: 2.2 meters
Step-by-step explanation:
The data is:
The initial piece is 6.35 meters long.
We cut 25 pieces of 16.2cm each, so in pieces only we have:
25*16.2cm = 405cm
1m = 100cm
Then: 405cm = (405/100) m = 4.05m
And each time that we cut a piece, we have 4mm of waste.
Then we have 25 times the 4mm of waste, this means that the total waste is:
4mm*25 = 100mm
and 1000mm = 1m
100mm = (100/1000) m = 0.1m
So the total amount that was cut is:
4.05m + 0.1m = 4.15m
The length in the channel iron will be: 6.35m - 4.15m = 2.2 meters
Seventy-two ten-thousandths. Try and see if this correct
Answer: 1/6
Step-by-step explanation:
Slope is the m in y=mx+b
Answer:
the answer should be D
Step-by-step explanation:
:)
Answer:
$50.08
Step-by-step explanation:
Let's use x to represent the lesser expensive hat and 2x to represent the more expensive hat since the more expensive hat is twice the price.
So, our equation would be 2x + x = 75.12
We can combine them together to make 3x.
Then, we make the 3x equal to 75.12
3x = 75.12
Now, we solve it.
Divide both sides by 3 to solve for x.
75.12/3 = 25.04
x = 25.04
Lastly, plug it in for 2x to get the price of the more expensive hat.
2(25.04) = ?
2(25.04) = 50.08
Therefore, the price of the more expensive hat is $50.08