Percent<span> simply means "per hundred" and the symbol used </span>to<span> express </span>percentage<span> is %. One </span>percent<span> (or 1%) is one hundredth of the total or whole and is therefore</span>calculated<span> by dividing the total or whole number by 100. </span>To calculate<span> the </span>percentage<span>difference between two numbers, the same basic calculations are used</span>
Let the curve C be the intersection of the cylinder
and the plane
The projection of C on to the x-y plane is the ellipse
To see clearly that this is an ellipse, le us divide through by 16, to get
or
,
We can write the following parametric equations,
for
Since C lies on the plane,
it must satisfy its equation.
Let us make z the subject first,
This implies that,
We can now write the vector equation of C, to obtain,
The length of the curve of the intersection of the cylinder and the plane is now given by,
But
Therefore the length of the curve of the intersection intersection of the cylinder and the plane is 24.0878 units correct to four decimal places.
In order to find which one is or isn't, you need to solve for the value of 'x'.
2x + 15 = 35
2x = 20
x = 10
Substitute x =10, into equation. If each side are not the same (i.e. 0=2), then that's the equation that is not equivalent,
Answer is B
Double check this. Chur! :)
Hope this makes sense.
Answer:
3.25 seconds.
Step-by-step explanation:
We can use the formula <em>Final Velocity = Initial Velocity + Acceleration * Time </em> to solve this problem.
First, we plug in the values we already know, and then we solve like normal:
1.5 = 0.2 + 0.4*t
1.3 = 0.4 * t
3.25 = t
Therefore, the mosquito accelerated for 3.25 seconds.
If this helped please consider giving me brainliest.
Because

and

are inversely proportional, there is some constant

such that

Given that

and

, we have

So when

, you have