The first term of the sequence is already given to be 3. Use this value to obtain the second term.
a2 = 2(a1)^2 = 2(3)² = 18
Use the value of the second term to get the third term through the equation,
a3 = 2(a2)² = 2(18)² = 648
Thus, the answer to this item is letter B.
<u>Answer:</u>
Cost of sand = £150
Cost of bricks = £157.5
Cost of cement = £134
Total cost = £441.50
<u>Step-by-step explanation:</u>
We are given that:
2 tonnes of sand is for £75.00 per tonne,
20 bags of cement are for £6.70 per bag,
350 bricks at 45p each,
So, 2 tonnes of sand at £75.00 per tonne = 2 * £75.00 = £150.00
20 bags of cement at £6.70 per bag = 20 * £6.70 = £134.00
350 bricks at 45p each = 350 * £0.45 = £157.50
Therefore, the total cost of all the materials = £150 + £134 + £157.5 = £441.50
Answer:
753
Step-by-step explanation:
m^2 =700^2 +460^-2 −2(700)(460)cos78
m^2 = 490000+211600-2(700)(460)(0.207912)
m^2 = 490000+211600-133895.12889
m^2 = 567704.87111
m=753.462=753
Answer:
6,000
Step-by-step explanation: