The black line is shorter than the gray. Let's simplify the rules. (B=Black, W=White, G=Grey
B is less than W which is less than G
That means G is greater than W. B is less than W, which is less than G. Therefore, the black line is not only shorter than the Gray one, but also the shortest out of the three.
I hope this Helps!
Answer:
20%.
Step-by-step explanation:
1: Bettina's 60, and Melvina's 20.
2: 4.5 gallons
Answer:
a) 3 people will need 35 days to paint the bridge
b) p=105/t
Step-by-step explanation:
a)
We have 7 people each one is to work 15 days, so the bridge needs a total of 7(15) days of work
7(15)=105
Then we have 3 people each one is to work t days, altogether should do a total of 105 days of work
3(t)=105
Solve for t
t=35
b)
Substitute p for 3 in the second equation
p(t)=105
Solve for p
p=105/t