1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sergeinik [125]
3 years ago
6

13

Mathematics
1 answer:
luda_lava [24]3 years ago
8 0

Answer:

0.028x-6-0.48x-2+0.552x

(0.028-0.48+0.552)x-6-2

0.1x-8

You might be interested in
Mike /
RoseWind [281]

Answer:

NO ANSWER

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Write the equations for 74,25a n d 49
schepotkina [342]

7425 ? 49
and = + in math
74250 + 49

8 0
4 years ago
Read 2 more answers
Find the Perimeter of the figure below, in inches
Andreas93 [3]

Answer:

117.8 in.

Step-by-step explanation:

To find the perimeter, add all the side lengths together. If we do that, we get 117.8 in, which is the answer.

8 0
3 years ago
Helpppp plss<br><br><br><br><br> Another one
AnnZ [28]

Answer: there’s no one question though

Step-by-step explanation:

5 0
3 years ago
It takes 313131 employees and \$7500$7500dollar sign, 7500 to build a car, and it takes 191919 employees and \$4300$4300dollar s
Rainbow [258]

Complete question :

It takes 313131 employees and \$7500$7500dollar sign, 7500 to build a car, and it takes 191919 employees and \$4300$4300dollar sign, 4300 to build a motorcycle. Genghis Motors wants to spend more than \$84000$84000dollar sign, 84000 to build cars and motorbikes using at most 706706706 employees. Let CCC denote the number of cars they build and MMM the number of motorbikes they build. Write an inequality that represents the condition based on the number of employees. Write an inequality that represents the condition based on the number of dollars.

Answer:

31C + 19M ≤ 706

7500C + 4300M > 84000

Step-by-step explanation:

C = number of cars built

M = number of motorcycles built

Cost of building a car :

Cost = 31 + $7500

Cost of building a motorcycle,:

Cost = 19 + 4300

To build, C cars :

Number of employees = 31C

7500 * C = 7500C

To build, M motorcycles :

Number of employees = 19M

4300 * M = 4300M

Genghis budget :

Amount > 84000

Number of employees ≤ 706

Hence, the constraints

31C + 19M ≤ 706

7500C + 4300M > 84000

5 0
3 years ago
Other questions:
  • Find the value of each value
    5·1 answer
  • How do you multiply a whole number by a fraction
    15·1 answer
  • Simplify by dividing <br> 3/5 ÷ -4/9<br><br> 1. -27/20<br> 2. 27/20<br> 3. -12/45<br> 4. 12/45
    12·1 answer
  • What is a part of a population used to describe the whole group?
    10·2 answers
  • Sandy spun a spinner with 5 equal parts labeled 1-5. What is the probability she will NOT spin a 4?
    13·2 answers
  • The admission fee at a small fair is 1.50 foe chikdren and 4.00 for an adult. On a certain day 5050 is collected if 1000 adults
    6·1 answer
  • 0+2=?<br> I need help again
    5·1 answer
  • Which relation is a function?
    6·1 answer
  • What is the measure of ABC
    7·2 answers
  • Solve for x help please in class
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!