Answer:
Here is a generic way to set up this type of algebra problem.
d = total amount of dirt at the site (tons)
r = rate or removal (tons/hr)
t = time it takes to remove all of the dirt (hr)
d = rt
The total amount of dirt equals the removal rate times hours spent removing all the dirt.
Since you want to solve for t, divide both sides by r
t = d/r
Answer:
0
Step-by-step explanation:
Let X to be a random variable that looks a binomial distribution which denoted the number of employees out of the 281 who earn the prevailing minimum wage or less
The sample size n = 281
The population parameter p = 5% = 0.05
Using normal approximation for the mean.



The standard deviation is:





By using continuity correction; the sample mean x is:
x = 30 - 0.5
x = 29.5
The z statistic test can now be as follows:



Z = 4.23
Thus, the probability that company A will get a discount is
P(X ≥ 30) = P(Z >4.23)
= 1 - P(Z < 4.23)
By using the Excel function for the z score 4.23 i.e. "=1 - NORMSDIST(4.23)" we get;
= 0.0000
Answer:
$33.25
this is your answer because you multiply $4.75 times 7 friends and get a total of $33.25